RIMG0725

University of Nottingham Science and Engineering Building

GECCO2 successfully commission another GSHP installation for the University of Nottingham.  The 180kW heating and cooling system provides 100% of the cooling and the majority of the heating requirement for the new facility topped up by the district heating network. 

GECCO2's state of the art installation which includes a direct cooling option when ground temperatures are suitable has enabled the University to maximise the potential of their Ground Source Heat Pump installation.  This potential has been realised through close working with Arup (Consultant Engineer), Mansell (Principal Contractor) and the Universities Control specialists (Schnieder).  Through early involvement and joined up thinking the scheme has been a huge success for all involved.